The Legace Build Method
Seven documented stages, the same on every project. You always know what stage your project is in, who is responsible, and what you receive at the end of it.
- LB-101
Requirement check
We confirm the sport, format, level of play, users and hours before anything is priced. A football ground is never quoted until we know whether it is 5s, 7s, 9s or 11s.
What you receiveWritten requirement summary, agreed with you
- LB-202
Site survey
Our engineers study soil, levels, slope, drainage, access and power on site. The right method depends on the land.
What you receiveSurvey record with photos and levels
- LB-303
Design & RFQ calculations
Layout, base and drainage design, lighting levels and structure, with design calculations as per your RFQ. Reviewed internally, then approved by you in writing.
What you receiveDesign package, drawings with revision numbers, BOQ
- LB-404
Sourcing & approvals
Materials from manufacturers certified to the standard your sport needs. Imported goods arrive by container and are checked against specification.
What you receiveMaterial submittals and test certificates
- LB-505
Build
Civil works, drainage, compacted and laser-levelled base, playing surface, electrical and MEP, floodlights, fencing and equipment, under a named project lead and a safety engineer.
What you receiveDaily site reports, stage photos, quality checklists
- LB-606
Testing & handover
Quality checks against the design and standard, a walkthrough with your team, and the full document pack.
What you receiveStability certificates, as-built drawings, warranty terms
- LB-707
Aftercare
Our own maintenance team keeps the facility match-ready, by visit or annual contract.
What you receiveMaintenance plan and service log
Rules every project follows.
Requirement first
We confirm format and use before quoting, so you never receive a quote for the wrong size.
One approved revision
Every drawing on site carries a revision number and your approval. Only the latest approved revision is used.
Written variations
Any change to scope, specification or date is recorded, priced and approved by you in writing before work changes.
Second-person check
Every estimate is checked by a second person before it reaches you.
Named responsibility
A project lead, site engineers and a safety engineer are named for your project.
Full document pack
Stability certificates, as-built drawings, design calculations, test certificates and warranty terms.
How long it takes.
An average-sized football turf takes about 45 days from site work to first match. Larger facilities follow a schedule agreed at LB-1, and a fast-track option is available when decisions come late.