Home / How we work

The Legace Build Method

Seven documented stages, the same on every project. You always know what stage your project is in, who is responsible, and what you receive at the end of it.

  1. LB-101

    Requirement check

    We confirm the sport, format, level of play, users and hours before anything is priced. A football ground is never quoted until we know whether it is 5s, 7s, 9s or 11s.

    What you receive

    Written requirement summary, agreed with you

  2. LB-202

    Site survey

    Our engineers study soil, levels, slope, drainage, access and power on site. The right method depends on the land.

    What you receive

    Survey record with photos and levels

  3. LB-303

    Design & RFQ calculations

    Layout, base and drainage design, lighting levels and structure, with design calculations as per your RFQ. Reviewed internally, then approved by you in writing.

    What you receive

    Design package, drawings with revision numbers, BOQ

  4. LB-404

    Sourcing & approvals

    Materials from manufacturers certified to the standard your sport needs. Imported goods arrive by container and are checked against specification.

    What you receive

    Material submittals and test certificates

  5. LB-505

    Build

    Civil works, drainage, compacted and laser-levelled base, playing surface, electrical and MEP, floodlights, fencing and equipment, under a named project lead and a safety engineer.

    What you receive

    Daily site reports, stage photos, quality checklists

  6. LB-606

    Testing & handover

    Quality checks against the design and standard, a walkthrough with your team, and the full document pack.

    What you receive

    Stability certificates, as-built drawings, warranty terms

  7. LB-707

    Aftercare

    Our own maintenance team keeps the facility match-ready, by visit or annual contract.

    What you receive

    Maintenance plan and service log

Never improvised

Rules every project follows.

Before pricing

Requirement first

We confirm format and use before quoting, so you never receive a quote for the wrong size.

Drawings

One approved revision

Every drawing on site carries a revision number and your approval. Only the latest approved revision is used.

Changes

Written variations

Any change to scope, specification or date is recorded, priced and approved by you in writing before work changes.

Estimates

Second-person check

Every estimate is checked by a second person before it reaches you.

Site

Named responsibility

A project lead, site engineers and a safety engineer are named for your project.

Handover

Full document pack

Stability certificates, as-built drawings, design calculations, test certificates and warranty terms.

Timelines

How long it takes.

An average-sized football turf takes about 45 days from site work to first match. Larger facilities follow a schedule agreed at LB-1, and a fast-track option is available when decisions come late.

Ready to build a sports space that performs for years?

Tell us the sport, the site and the timeline. We'll come back with the right format and an indicative budget.

Request a quote All ways to reach us
WhatsAppWhatsApp Call 080 6542 6355Call EnquireEnquire
Latest from site
All reels